Reconcile Overlapping Component Incidents Before Quoting Downtime

Combine component incident intervals under the actual workflow dependency rule, preserving overlap, optional components and availability evidence limits.

Reconcile overlapping incidents before turning component records into a workflow downtime statement. Two twenty-minute component incidents can produce thirty minutes of workflow unavailability, ten minutes or another result, depending on overlap and the workflow's actual dependency rule.

Use a component-to-workflow map plus interval set operations. The artifact reconstructs a declared fictional incident history. It does not establish an uptime guarantee, infer missing incidents or measure every customer's experience from a status page.

Define the workflow predicate first

Name the task the user needs to complete and the components it actually requires. A login page, background export and optional reporting widget can have different dependencies. Do not treat every component on a status page as equally necessary to the same workflow.

Then state what makes that workflow unavailable. If it requires both A and B, failure of either can interrupt it. If either A or B independently suffices, both must be unavailable at the same time to remove every supported path.

The availability-claim guide establishes component, window, coverage and evidence scope. This method adds an exact reconstruction of overlapping known intervals under a verified dependency predicate, before calculating any percentage.

Freeze a complete fictional incident record

Assume component A is unavailable from 10:00 through before 10:20. Component B is unavailable from 10:10 through before 10:30. Both times are in the same declared UTC hour. The records fully specify those teaching intervals and no others.

Use start-inclusive, end-exclusive intervals. At exactly 10:20, A has recovered under this fixture. At exactly 10:30, B has recovered. These are invented observations for a set calculation, not incidents reported for an actual service.

Component C, an optional widget, is unavailable from 10:25 through before 10:40. Neither of the two workflow predicates below requires it. Keeping C in the input record tests whether the reviewer adds irrelevant component time.

Calculate a workflow that requires both A and B

When both components are required, the workflow is unavailable whenever either is unavailable. Its unavailable set is the union of A's and B's incident intervals.

IntervalABBoth-Required Workflow
10:00–10:10UnavailableAvailableUnavailable
10:10–10:20UnavailableUnavailableUnavailable
10:20–10:30AvailableUnavailableUnavailable
From 10:30AvailableAvailableAvailable under this predicate

As a separate endpoint fixture, move B to 10:20–10:40 while keeping A at 10:00–10:20. Their overlap is then zero under the declared convention. The both-required workflow loses forty continuous minutes, while the either-suffices workflow has no interval with both components unavailable. This checks that the review does not subtract overlap where none exists.

The union in the original fixture is one continuous interval from 10:00 to before 10:30, totaling thirty minutes. Summing the two component durations gives forty minutes and counts the ten-minute overlap twice.

Equivalently, twenty plus twenty minus their ten-minute intersection equals thirty. Preserve that overlap as a distinct set relationship rather than subtracting an arbitrary adjustment merely to match a displayed total.

Calculate a workflow where either component suffices

Now evaluate a different fictional design in which A or B can independently serve the task. The workflow loses every supported path only while both are unavailable. Its unavailable set is their intersection.

That intersection runs from 10:10 through before 10:20 and totals ten minutes. The component records did not change. The workflow design changed which combinations count as interruption.

An answer reporting thirty minutes for this alternative has applied the both-required rule to a redundant-path design. An answer reporting ten minutes for the first design makes the opposite substitution. Neither can be repaired by checking arithmetic alone.

Keep optional components outside the required set

C's fifteen-minute outage does not extend either declared workflow's interruption because C is not required. Adding its time would change the question from the named task to another, unstated service boundary.

This is not a universal rule that reporting widgets never matter. If the actual user task requires the widget, its dependency belongs in the model. Obtain that requirement from the source or owner rather than excluding an inconvenient component to improve the number.

A source can list all three incidents accurately while an answer produces the wrong workflow duration. Preserve both the original incident records and the dependency evidence so the failure can be located precisely.

Choose interval operations that retain their meaning

A union can contain several separated intervals. Do not replace it with one range from the earliest start to the latest end if healthy gaps exist between incidents. That would turn known available time into downtime.

PostgreSQL's range and multirange documentation distinguishes operations on ranges and multiranges, including unions that may be disjoint. That is a useful computational distinction, not a claim that PostgreSQL defines a provider's availability metric or that this example ran a database query.

The number check should inspect the actual interval set, not just its first and last timestamps. A correct count requires the gaps and overlaps to survive normalization.

Preserve evidence and missing coverage

An incident list may not measure every affected minute, account or operation. This calculation assumes the listed teaching intervals and dependency rules are complete for its narrow purpose. Do not promote that assumption into a claim about a real status page without supporting evidence.

If A's recovery time is unknown, the exact union duration is unknown. If the source says degraded rather than unavailable, establish how that state affects the named workflow before treating every minute as a binary outage.

Use the source worksheet for the event definitions, timestamps, component scope and coverage limits. The calculation cannot recover observations the source never supplied.

Keep contract exclusions and architecture claims separate

A contractual service calculation can exclude scheduled maintenance or define another measurement unit. Apply only the actual approved terms when answering that question; do not import exclusions into a historical observation silently.

Likewise, a redundancy diagram does not prove which incident intervals occurred. An observed thirty-minute outage does not establish every architectural fault path. Dependency evidence and incident evidence are related inputs with different authority.

The joint-evidence review can check whether the passages apply to the same product configuration and period. Two correct sources about different deployments cannot be combined into one downtime history.

Release the reconstructed duration

Retain the workflow predicate, component intervals, endpoint convention, normalized union or intersection, duration and source limitations. Have another reviewer reproduce thirty minutes for the both-required fixture and ten for the either-suffices fixture.

The useful answer explains why overlap and dependency change the result. It leaves a percentage, contractual promise or broader service conclusion unclaimed until the appropriate denominator, coverage and actual terms are established.